Municipal engineers and planners share measurable outcomes from our hydro-engineering work across Nigeria.
"The subsurface retention gallery in Kano reduced our peak runoff by 34% within the first six months. The monitoring well data confirmed a stable infiltration rate of 0.8 m/day, which matched the pre-construction model within 5% tolerance."
Chinedu Olutola, Senior Engineer, Kano State Urban Drainage Program"Tasology's soil permeability mapping for our Lagos basin project identified three critical lateritic layers that standard surveys had missed. This directly prevented a retention basin failure during the 2023 wet season."
Adedayo Kayode Oluwatosin, Project Manager, Lagos Municipal Water Authority"The compliance checklist aligned with the Water Resources Act saved us six weeks of permit processing. The geotechnical screening recommendations became part of our standard pre-construction protocol."
Isioma Sumayyah Wilcox, Director of Infrastructure, Oyo State Planning CommissionDirect lines for municipal engineering inquiries